المهندس حسين
عضو نشط
خبر من موقع الشركة
To develop its cargo operations, LoadAir placed an order with Boeing in July 2006 for two new 747-400ERFs powered by GE engines. By acquiring the 747-400ERF, with a payload capacity of up to 113 tons, LoadAir will have access to fuel efficient equipment with the longest range for any available cargo aircraft. This allows LoadAir to serve major Asian and European cargo hubs on a time efficient way.
The Delivery of LoadAir Aircraft’s is expected to be during the 4th quarter of 2009. Operations are expected to commence upon delivery.
بإختصار أن الشركة تتوقع وصول طائرتي بوينغ 747 في الربع الأخير من 2009 وبدأ التشغيل فور وصول الطائرتان
To develop its cargo operations, LoadAir placed an order with Boeing in July 2006 for two new 747-400ERFs powered by GE engines. By acquiring the 747-400ERF, with a payload capacity of up to 113 tons, LoadAir will have access to fuel efficient equipment with the longest range for any available cargo aircraft. This allows LoadAir to serve major Asian and European cargo hubs on a time efficient way.
The Delivery of LoadAir Aircraft’s is expected to be during the 4th quarter of 2009. Operations are expected to commence upon delivery.
بإختصار أن الشركة تتوقع وصول طائرتي بوينغ 747 في الربع الأخير من 2009 وبدأ التشغيل فور وصول الطائرتان